Groundwater Conditioning Technologies and Facilities Providing the Possibility to Use This Water for Domestic and Drinking Purposes

We offer

A full complex of operations comprising the following: technological survey, developing the engineering aspect of a project, development of operating regulations and designer supervision of non-standard equipment production and installation.

Methods: iron removal, softening, manganese removal, fluorine removal, stabilization, СО2 and Н2S removal.

We provide treated water quality in accordance with the standards established by SanPiN 2.1.4.1074-01 Sanitary Regulations.

The treatment capacity of facilities is within the range 0.1- 1500 m3/hour

 

Implemented technological processes:

Aeration, degassing, biochemical methods, ozonation, contact non-reagent and reagent filtration through clarification and sorption filter-beds and disinfection.

The methods and design of facilities are copyrighted (8 inventor’s certificates and patents for invention of the Russian Federation). 

Applied materials have State Registration Certificates and are officially permitted for the application in drinking water supply systems. All permissions are granted by the Russian Federal Service of Consumer Rights Protection and Human Welfare. 

Advantages

Reduced capital costs (by 15-20%) and operating costs (by 25-30%) compared to traditional technologies due to:

  • New biochemical technologies and ozonation + sorption
  • Application of heterogeneous floating fibrous granular polymeric filter-bed of great contamination retention capacity and highly efficient sorption materials
  • Application of attached-microorganisms carriers and new technologies of biochemical oxidation and disinfection
  • Avoiding the application of power-consuming wash-water pumps and high-resistance drainage systems
  • Reduced transportation costs for filter-bed preparation and hauling (10 – 15 times)
  • Application of hydro-automatic washing devices  

 


Treatment facilities for the treatment of surface run-off from urban territories, industrial enterprises, fuel-filling stations, bus garages, garage complexes and motor roads in accordance with the requirements established for treated water discharge into water bodies of fish-breeding quality

 

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, storage facilities, pressure filters 

Treatment capacity, m³/hour

1.0 – 800.0

Raw water concentration of pollutants, mg/l

p/p*     s/s*     BOD*     COD*

 

70    1000   400   800

Treated water concentration of pollutants, mg/l

p/p     s/s    BOD     COD

 

0.05  10.0   3.0    30.0

Sludge treatment method and equipment

Mechanical method (grit dewatering bays)

*p/p = petroleum products; s/s = suspended solids; BOD = bio-chemical oxygen demand; COD = chemical oxygen demand

Design work cost: 200 – 600 thousand rubles

Cost of building and erection operations: 1 600 – 9 000 thousand rubles

Cost of equipment: 420 000 – 5 000 thousand rubles

TOTAL COST: 2 220 000 – 15 000 thousand rubles

 


Surface run-off treatment facilities providing the quality of treated water in accordance with the requirements established for water reuse for the technical purposes of municipal economy sector and industrial enterprises 

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, storage facilities, pressure filters, treated water disinfection unit

Treatment capacity, m³/hour

0.1 – 200.0

Raw water concentration of pollutants, mg/l

p/p     s/s      BOD     COD

 

50   1000   150   700

Treated water concentration of pollutants, mg/l

p/p    s/s    BOD     COD

 

0.1   3.0      2.0   15.0

Sludge treatment method and equipment

Mechanical method applying filter-presses 

 

Design work cost: 200– 500 thousand rubles

Cost of building and erection operations: 700 – 3 600 thousand rubles

Cost of equipment: 280 – 3 000 thousand rubles

TOTAL COST: 1 190 – 7 050 thousand rubles

 


Industrial wastewater and storm-water advanced treatment facilities meeting the requirements established for the quality of water to be used for open service water systems of industrial facilities  

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, storage facilities, pressure filters, treated water disinfection unit

Treatment capacity, m³/hour

1.0 – 800.0

Raw water concentration of pollutants, mg/l

p/p    s/s     BOD     TMC*

 

200   1500   200   100

Treated water concentration of pollutants, mg/l

p/p     s/s     BOD    TMC

0.05   10.0   3.0     10

Sludge treatment method and equipment

Mechanical method applying centrifuges

* TMC = total microbial count

Design work cost: 580 – 1 700 thousand rubles

Cost of building and erection operations: 1 950 – 11 400 thousand rubles

Cost of equipment: 140 – 3 800 thousand rubles

TOTAL COST: 2 670 - 17 000 thousand rubles

 


Complex facilities for the treatment of automobile wash-water and sludge aimed at thus treated wastewater reuse for recycling process water supply purposes

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, oil separators, settling tanks, pressure filters, treated water disinfection unit

Treatment capacity, m³/hour

1.0 – 50.0

Raw water concentration of pollutants, mg/l

p/p    s/s    BOD    SS*

 

800   5000   400   100

Treated water concentration of pollutants, mg/l

p/p    s/s    BOD    SS

 

0.3    10.0    3.0     0.5

Sludge treatment method and equipment

Mechanical method applying vacuum filters

*SS = synthetic surfactants

Design work cost: 400 – 740 thousand rubles

Cost of building and erection operations: 480 – 2 000 thousand rubles

Cost of equipment: 550 – 3 000 thousand rubles

TOTAL COST: 1 430 – 5 740 thousand rubles

 


Facilities for neutralization of petroleum-containing sludge produced by storm-water treatment facilities applying microbiological agents aimed at resulting sludge application in municipal economy sector

Petroleum-containing sludge treatment method

Microbiological method

Process flow diagram composition

Settling tanks, grit-dewatering bays, contact tanks, collecting bins

Treatment capacity, m³/hour

1.0 – 500.0

Concentration of petroleum products in raw sludge, mg/g

4500.0

Concentration of petroleum products in neutralized sludge, mg/g

0.5

 

Design work cost: 350 – 710 0 thousand rubles

Cost of building and erection operations: 1 800 – 6 500 0 thousand rubles

Cost of equipment: 200 – 1 700 thousand rubles

TOTAL COST: 2 350 – 8 910 thousand rubles

 


Compact facilities for industrial wastewater and storm-water treatment applying high-efficient sorption materials providing the removal of heavy metals in order to meet the requirements established for discharge into fish-breeding quality water bodies

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Решётки, аккумулирующие ёмкости, напорные фильтры

Treatment capacity, m³/hour

1.0 – 50.0

Raw water concentration of pollutants, mg/l

Copper      chromium     zinc     nickel

 

5.0       8.0     10.0    5.0

Treated water concentration of pollutants, mg/l

Copper      chromium      zinc      nickel

 

0.001   0,07   0,01    0.01

Sludge treatment method and equipment

Mechanical method (grit-dewatering bays)

 

Design work cost: 340 – 640 thousand rubles

Cost of building and erection operations: 930 – 8 200 thousand rubles

Cost of equipment: 1600 – 5 500 thousand rubles

TOTAL COST: 2 870 – 14 340 thousand rubles

 


Wastewater treatment facilities applying high-efficient filtration and sorption materials for petroleum products removal in order to meet the requirements established for discharges into water-bodies of fishing quality 

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, storage facilities, pressure filters

Treatment capacity, m³/hour

1.0 – 200.0

Raw water concentration of pollutants, mg/l

p/p     s/s     BOD     phenols

 

100   800   500   20

Treated water concentration of pollutants, mg/l

p/p     s/s     BOD      phenols

 

0.05    10.0    3.0    0.001

Sludge treatment method and equipment

Mechanical method applying centrifuges

 

Design work cost: 720 – 900 thousand rubles

Cost of building and erection operations: 800 – 4 400 thousand rubles

Cost of equipment: 850 – 4 000 thousand rubles

TOTAL COST: 2 370 – 9 300 thousand rubles

 


Combined industrial wastewater and storm-water treatment facilities applying water-soluble polyelectrolytes

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, flocculators, settling tanks, pressure filters

Treatment capacity, m³/hour

1.0 – 30.0

Raw water concentration of pollutants, mg/l

p/p    s/s    BOD    phenols

 

50       300     100      20

Treated water concentration of pollutants, mg/l

p/p    s/s    BOD    phenols

 

0,05    10,0     3,0      0,001

Sludge treatment method and equipment

Mechanical method applying filter-presses

 

Design work cost: 400 – 920 thousand rubles

Cost of building and erection operations: 1 700 – 5 420 thousand rubles

Cost of equipment: 430 – 2 600 thousand rubles

TOTAL COST: 2 530 - 8 940 thousand rubles

 


Complex facilities for the treatment of electroplating wastewater produced by repair and service shops of motor transport enterprises and taxi companies   

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, neutralizing tanks, flocculators, settling tanks, filters

Treatment capacity, m³/hour

1.0 – 10.0

Raw water concentration of pollutants, mg/l

chromium      copper     zinc     s/s 

 

 

20     10       20     100

Treated water concentration of pollutants, mg/l

chromium     copper     zinc     s/s 

 

0.1     0.01   0.1    3.0

Sludge treatment method and equipment

Mechanical method applying centrifuges

 

Design work cost: 330 – 720 thousand rubles

Cost of building and erection operations: 1 400 – 3 600 thousand rubles

Cost of equipment: 310 – 2 000 thousand rubles

TOTAL COST: 2 040 – 6 320 thousand rubles

 

Development of recommendations for the reconstruction and modernization of existing facilities for the treatment of surface run-off from urban territories and industrial enterprises

Cost of work: 520 thousand rubles

 

Plant for monitoring the composition of wastewater being discharged into municipal wastewater disposal systems

Design work cost: 520 000 – 960 000 rubles

Cost of building and erection operations: 1 500 000 – 4 800 000 rubles

Cost of equipment: 150 000 – 900 000 rubles

TOTAL COST: 2 170 000 – 6 660 000 rubles

 


Mobile installations for surface run-off and industrial wastewater sludge dewatering applying modular centrifuging units

Sludge treatment method

Mechanical method

Process flow diagram composition

Regulating reservoir, flocculant feeder, centrifuge units, collection tank

Dewatering capacity, m³/hour

1.0 – 20.0

Raw sludge water content, %

95

Dewatered sludge water content, %

30

 

Design work cost: 400 – 720 thousand rubles

Cost of building and erection operations: 950 – 2 400 thousand rubles

Cost of equipment: 80 – 350 thousand rubles

TOTAL COST: 1 430 – 3 470 thousand rubles

 

Development of a methodology for inspecting the existing industrial wastewater disposal systems of enterprises aimed at establishing an expedient water use practice

The cost of methodology development: 450 thousand rubles

 

Development of engineering proposals for the reconstruction of water treatment systems and expedient water use (thermal power stations, boiler houses and other enterprises of thermal power complex

Cost of work: 600 thousand rubles

 

Facilities for flocculant-based treatment of wastewater produced by textile industry enterprises as a result of dyeing processes meeting the quality standards established for the treated wastewater to be disposed into municipal wastewater disposal systems    

Wastewater treatment method

Physical and chemical method

Process flow diagram composition

Screens, neutralization tanks, flocculators, settling tanks, filters

Treatment capacity, m³/hour

1.0 – 100.0

Raw water concentration of pollutants, mg/l

s/s      COD      iron      lead

 

500   10000     50       10

Treated water concentration of pollutants, mg/l

s/s      COD      iron      lead

 

10      100        0,5      0,01

Sludge treatment method and equipment

Mechanical method applying filter-presses

 

Design work cost: 640 – 920 thousand rubles

Cost of building and erection operations: 760 – 3 100 thousand rubles

Cost of equipment: 1 800 – 4 400 thousand rubles

TOTAL COST: 3 200 – 8 420 thousand rubles

 

Substantiating the operation procedures for the improvement of water-bodies and urban territories applying erosion control blankets

The cost of operating procedures development: 430 thousand rubles 

22, Pleteshkovsky Pereulok, 105005, Moscow Tel: 8 (499)261-53-84; Fax: 8 (499)261-77-75  e-mail: post@mvkniipr.ru